• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Wyo-Ben, Inc.
  • 800.548.7055
  • 406.652.6351
  • Contact Us
  • Home
  • About
    • About Wyo-Ben
    • Meet Our Team
    • History
    • Awards
  • Products
    • All Products
    • Absorbents
    • Civil Engineering
      • Caisson/Foundation
      • Liners & Caps
      • Slurry Cut-Off Walls
    • Drilling
      • Grouting
      • HDD
      • Oil Well
      • Water/Minerals
    • Industrial Applications
    • Water Treatment
    • Testing Equipment
  • Wyo-Ben Pet
  • Calculators/Resources
    • Hole Volume Calculator
      • Plugging Holes or Casing
      • Annular Space
    • Annular Velocity Calculators
      • Annular Velocity [Air]
      • Annular Velocity [Fluid]
    • HDD Back Reaming/Pump Volume Calculator
    • Fluid Weight Up & Volume Increase Calculator
    • Bottoms Up Calculator
    • Mud Recycler Calculator
    • Resources
  • Find a Dealer
  • Mud School
You are here: Home / News / HDD in Tough Conditions: Drilling Between a Rock and a Hard Place

HDD in Tough Conditions: Drilling Between a Rock and a Hard Place

Trenchless construction projects suffer from the same pressures as any construction project – those that make you fall behind schedule and increase cost. However, there is always a higher degree of uncertainty about factors affecting project execution when working underground and running a horizontal directional drilling (HDD) project. This uncertainty makes it even more critical to manage the variables within our control, like using the right materials and tools for the right job.

Read the full article

Footer

  • Careers
  • News
  • Events
  • 1345 Discovery Drive
    Billings, MT 59102
  • 800.548.7055
  • 406.652.6351
  • Contact Us

© Copyright 2023 Wyo-Ben, Inc., All Rights Reserved.

Privacy Policy | Terms and Conditions